Dhaka South City Corporation

Name of Work: Stainless Steel & Mild Steel Guard Rail Footpath & Paving Block Passengers waiting shed with Seating Arrangement. Traffic Signal Installation and maintenance. Road marking and pavement Tiles. Project Year: 2018-19

HydroChina

Name of Work: 700mm dia 27m to 35m long cast in situ pile work at Aftabnagar Bridge Station. 600mm dia 38m long cast in situ pile work at Hatirjhil Sewer Lifting Station for Dasherkandi Sewerage Plant. Project Year: 2018-19

RAHIMAFROOZ

Name of Work: Construction and Supply of Structure for 8nos of solar irrigation Pump for BMDA. Construction and Supply of Structure for3.00kW, 6.5KW, 10.00KW, 14.5KW, 35KW of solar irrigation Pump for VBCA project’ Supply & Installation of Solar Street Lamp Post. Traffic Signal system maintenance work under Dhaka City Corporation. …

RAHIMAFROOZ Read More »

M/S ZAMAN TANNERY

Name of Work: 60’ depth 24” dia cast in situ Pile Construction of Foundation and ground floor of approximate 8250 sft. Supply & Installation of 150KVA Substation. Project Year: 2016

Hazaribagh Canal Development work under DWASA

DHAKA WASA

Name of Work: Construction of Water Supply Facilities for Low Income Community (LIC) at Duaripara slum near Mirpur under Dhaka Water Supply and Sanitation Project. Rehabilitation and Modernization, interior and Furniture Supply for Mirpur zonal office-4. ( Main Gate, Stair Railing, Door & Window, Electrical, ACP, Paint, Solar Shading and …

DHAKA WASA Read More »

KA DESIGN LTD

Name of Work: Construction 2500 Sqm Steel Factory Building. Landscaping and Beautification of Factory Area. Supply of Electrical Equipment. Project Year: 2015